Large chillers
Selection, rigging, installation and commissioning of water-cooled plants up to 5,000 tons of refrigeration.
Up to 5,000 TRTEKNO installs and services the heavy end of HVAC — chillers to 5,000 tons, cooling-tower fans 10 metres across — then proves every system on site with testing, balancing and vibration analysis.
Hot side. Cold side. In balance since 2008.
Nine disciplines, one standard: installed with care, verified with instruments — from the chiller hall to the cooling-tower deck.
Selection, rigging, installation and commissioning of water-cooled plants up to 5,000 tons of refrigeration.
Up to 5,000 TRLarge-diameter (900–1200 mm) chilled-water piping systems; welding, insulation, hydrostatic testing and system flushing.
Mains-bore networksSupply, alignment and precision balancing of axial fans up to 10 metres in diameter, on the tower — adjusting blade pitch as well as the clearance between the blade and the wall.
Ø up to 10 mFull TAB of air and hydronic systems with calibrated instruments — delivered as a signed report.
Air + hydronicSpring and pad isolation, spectrum analysis and fault diagnosis on rotating equipment of every size.
ISO 10816 gradedSingle- and two-plane balancing of fans and rotors in place — no dismantling, minimal downtime.
In situ · 2-planePlate and shell-and-tube units, small to large: supply, retubing, regasketing and performance recovery.
Plate · shell & tubeLow-noise, draft-free air distribution engineered for acoustically sensitive halls and theatres.
NC-rated comfortField engineers on call for breakdowns, seasonal changeovers and ongoing plant-health monitoring.
On call · on siteEvery job ends in numbers — flow rates, air volumes, vibration velocities — measured on site and signed off against design before handover.
We record the plant as it runs — flows, temperatures, spectra — before anyone touches a valve.
Equipment, isolation and piping selected from the measurements, not the catalogue.
Rigging, welding and alignment to millimetre tolerances, sequenced around your operations.
Full TAB and vibration report, checked against design values and signed before we leave.
Most contractors stop where our work begins. When the machine is the size of a room, precision matters more — not less.
Tell us what's running rough — a shaking fan, a drifting chiller, a system that never quite hit design. An engineer replies within one working day.